Index > ABOUT US > Milestones
Milestones
1980 Established WINSON Machinery Casting Co.,LTD at Yuanlin Town, Changhua County, Taiwan.
2001 Expanded the Yuan-Lin factory to reach the monthly production capacity is 1,000 tons.
2004 Purchased a site for new factory at Changhua Lugang Coastal Industrial Park, near Taichung harbor, contributory to Taiwan International trading commercial.
2005 Completed the 1st section of the new factory at Lugang town, The capital increase to USD2.9million.
2006 Completed the Office building at Lugang town.
2007 Complete the 2nd section of the Lugang factory , The capital increase to USD4.7million
2008 Builing the 3rd section of the Lugang factory, The site increase to 12,000㎡, The monthly production capacity is 3,000 tons. Additional purchasing 6tons medium frequency electric melting furnace for Ductile casting iron. Applying ERP system and 6S Activities to QA circle. Preparing stock to be listed on the stock exchange, The capital increase to USD7.1millions. Obtaining ISO9001:2000.
2009 Sign the contaract with the Metal centre to develop wind-power generator cast. Starting to export to north American market.
2010 Building the 4th section of the Lugang factory, Production Lines increased to 6 lines. Additional purchasing 6tons medium frequency electric melting furnace , Starting to export to Japan market.
2011 Building 5th section of Lugang factory , additional purchasing Italy IMF furan molding equipment and sand recycling equipment. The monthly production capacity is 4,000 tons. The FSC Securities and Futures Bureau approved us to issue shares at 29 Dec.
2012 Gretai Securities Market approved us to login emerging trading at 28 May, The capital increase to USD20.3millions.
2015 Export ratio of company total revenue exceeded 25%
2016 “Industrial Upgrade and Innovative Platform Guidance Program: Application of Multi-Axis Robotic Arm on Castings Grinding System Technical Research & Development” approved by the Industrial Development Bureau, Ministry of Economic Affairs; Capital reduction by cash USD 2.8 million, capital reduced to USD 13 million
2017 Chosen as one of the "TOP 1000 Taiwan SMEs D&B Awards". Application of ITACA Cast Iron Thermal Analysis.
2018 Subsidized from Taiwan Science Park Bureau Ministry of Science and Technology of industrial robotic arm application project.
2019 Cash capital increase of 56 million, with a capital of 476 million; and listed on the OTC on 1/15.
Through the industrial upgrading and innovation platform guidance program - The smart metallurgical system construction for the 5-axis machine bed casting
2020 The capital increases to USD 18 million.
2021 Approved by the "Small and Medium Enterprise Accelerated Investment Action Plan" on April 23rd